Cost estimation
Description :
In this seminar, the handling of the cost estimation integrated in the rehabilitation planning PISA is trained. In this process, the renewal and partial renewal quantities and costs of an open construction method for sewer pipes, connecting pipes and manholes are determined. The quantity method used takes into account cost groups such as surface stabilization, excavation, shoring, bedding, laying, dewatering and backfilling.
Requirement :
BaSYS PISA basic training
Duration and cost :
The online briefing on this topic usually takes about 60 minutes and costs € 150,- per person plus VAT. Payment on account.
Register Now
All fields marked with * are required. We will contact you shortly to arrange the date.